Renewable Energy EPC

TDC VN delivers engineering, procurement, and construction for renewable energy projects — from utility-scale solar farms and rooftop solar systems to nearshore wind and biomass processing plants.

Our teams have worked on solar projects from 1 MWp rooftop systems up to 256 MWp solar farms, alongside international EPC contractors and owners’ engineers such as iLF, Artelia, and Fichtner. In biomass, TDC VN designed and built its own 120,000-ton-per-year wood-chipping plant in Hòa Hội, Ho Chi Minh City, which serves as the wood chip source for the black wood pellet factory TDC VN is building at Châu Đức Industrial Park.

What we deliver

  • Design, supply, erection, and testing & commissioning of rooftop and ground-mounted solar systems
  • Mechanical and electrical works for solar farms
  • Civil, mechanical, building, and electrical works for solar farms
  • Civil works for nearshore wind farms
  • Design and construction of biomass processing plants
  • Operation & maintenance after handover, on request

Key facts

Typical project sizeFrom 1 MWp; delivered projects range from 1 MWp rooftop systems to 256 MWp solar farms
Typical construction time3–7 months, depending on project size
CoverageNationwide across Vietnam, mainly Southern Vietnam; projects outside Vietnam also undertaken
LicenceConstruction Capability Certificate, Class II
WarrantyTypically 12 months, depending on the project

Not included: Grid connection and permitting with EVN, and project financing or PPAs, are handled by the project owner.

How we work

  1. Site survey and requirements review — we visit the site and confirm scope, constraints, and schedule with you.
  2. Design and engineering — full design for design-and-build and EPC contracts, or design review for build-only contracts.
  3. Quotation and contract — a clear scope, price, and programme.
  4. Procurement and construction — with HSE and quality control on site every day.
  5. Testing, commissioning, and handover.
  6. Warranty and after-sales support — typically 12 months, with operation & maintenance (O&M) available on request.

Selected projects

View all projects →

Frequently asked questions

Does TDC VN install rooftop solar for factories and warehouses?

Yes. TDC VN has delivered rooftop solar systems for factories, warehouses, and agricultural facilities, typically from 1 MWp upward.

What size of solar projects has TDC VN worked on?

From 1 MWp rooftop systems to utility-scale solar farms of 104 MWp, 108 MWp, and 256 MWp in An Giang, Tay Ninh, and Khanh Hoa (formerly Ninh Thuan).

How long does a solar EPC project take?

Typically 3–7 months, depending on project size.

Does TDC VN handle grid connection and permits with EVN?

No. Grid connection and permitting with EVN are handled by the project owner. TDC VN focuses on engineering, procurement, construction, and commissioning.

Does TDC VN provide operation & maintenance (O&M) after handover?

Yes. O&M services are available after handover on request, in addition to the standard warranty period (typically 12 months).

Does TDC VN work on wind and biomass projects?

Yes. TDC VN carried out civil works for the 30 MW ST7 nearshore wind farm in Vinh Chau (formerly Soc Trang Province). In biomass, it designed and built a 120,000-ton-per-year wood-chipping plant in Hòa Hội, Ho Chi Minh City, which supplies wood chips to the black wood pellet factory TDC VN is building at Châu Đức Industrial Park (expected to operate from Q1/2027).

Other services: Factory Renovation · Industrial Construction

Discuss your project with TDC VN

Phone: +84 90 395 6636 / +84 90 375 6636
Email: info.tdc@tdcvn.net