Factory Renovation

TDC VN renovates and upgrades factories, offices, and warehouses for manufacturers, including multinational clients such as Jotun, BEL, and J. Wagner.

As main contractor, we handle civil and finishing works, MEP, firefighting systems, and interior fit-out under one contract, including fire safety (PCCC) approval. Where the client requires it, we renovate while the factory stays in operation, with minimal disruption to production. Our largest renovation to date covered 99,730 m² at Jotun’s factory in Hiep Phuoc Industrial Park.

What we deliver

  • Civil and finishing works, canopies
  • MEP, firefighting, and fit-out
  • Renovation of office buildings, production buildings, and warehouses
  • Interior and exterior decoration works
  • Fire safety (PCCC) approval for renovated facilities

Key facts

Typical project sizeFrom 1,000 m²; delivered projects range from 1,000 m² to 99,730 m²
Typical construction time6–18 months, depending on project size
CoverageNationwide across Vietnam, mainly Southern Vietnam; projects outside Vietnam also undertaken
LicenceConstruction Capability Certificate, Class II
WarrantyTypically 12 months, depending on the project

Not included: Structural modifications that would compromise the integrity of the existing building.

How we work

  1. Site survey and requirements review — we visit the site and confirm scope, constraints, and schedule with you.
  2. Design and engineering — full design for design-and-build and EPC contracts, or design review for build-only contracts.
  3. Quotation and contract — a clear scope, price, and programme.
  4. Procurement and construction — with HSE and quality control on site every day.
  5. Testing, commissioning, and handover.
  6. Warranty and after-sales support — typically 12 months, with operation & maintenance (O&M) available on request.

Selected projects

  • Jotun Paint Vietnam Factory — 99,730 m², Hiep Phuoc Industrial Park — MEP, firefighting, and fit-out over 18 months
  • J. Wagner Factory — 13,000 m², Saigon – Linh Trung EPZ — office, production, and warehouse renovation in 6 months
  • BEL Vietnam Factory — 1,000 m², Song Than Industrial Park — civil and finishing works and canopies in 6 months

View all projects →

Frequently asked questions

Can TDC VN renovate a factory while it is still operating?

Yes. When a project requires it, TDC VN plans and phases the works so the factory can keep operating, with minimal disruption to production.

What does a factory renovation by TDC VN include?

Civil and finishing works, MEP, firefighting systems, and interior fit-out for offices, production areas, and warehouses — delivered as main contractor under one contract.

Which companies has TDC VN renovated factories for?

Jotun Vietnam (Hiep Phuoc Industrial Park, 99,730 m²), J. Wagner (Saigon – Linh Trung Export Processing Zone, 13,000 m²), and BEL Vietnam (Song Than Industrial Park, 1,000 m²).

How long does a factory renovation take?

Typically 6–18 months, depending on project size.

Does TDC VN handle fire safety approval (PCCC) for renovated factories?

Yes. TDC VN handles the fire safety (PCCC) approval process for the factories it renovates.

Other services: Renewable Energy EPC · Industrial Construction

Discuss your project with TDC VN

Phone: +84 90 395 6636 / +84 90 375 6636
Email: info.tdc@tdcvn.net